1. Three machines' work, one clamping
A plate that needs drilled holes, tapped threads and a milled edge or pocket usually travels between three machines: a drill press, a tapping machine and a milling station. Each move means unclamping, carrying, re-clamping and re-finding the datum — and each of those steps can put the next operation in a slightly different place from the last one.
The L series is built to take that travel out. It is a six-axis CNC drilling, tapping and milling center that runs all three operations in one clamping, under one program, on a moving gantry. The plate is clamped once, the datum is set once, and the BT30 spindle works through the whole pattern: drill, tap, change tool, mill. Four models cover plates from 1000 x 2000 mm (LF1020B) to 2000 x 4000 mm (LF2040B), with LF-1325B at 1300 x 2500 mm and LF1530B at 1500 x 3000 mm in between.
That matters most for the parts the series is built for: sheet metal counterbore and tapping work, and thicker plate drilling, tapping and milling, in aluminum plate, aluminum profile, steel plate and square tube. One setup is what lets a mixed job — a panel with counterbored holes, threads and a milled edge — leave the machine finished instead of half-finished.
2. Before the spindle starts: clamp once, set the datum once
The whole point of one clamping is that the plate does not move until the part is finished. So the setup work happens before the first cut, and it is worth doing properly.
Clamp the plate where it will be machined and leave it there. Positioning and clamping are specified as straightforward on the L series, and the rigid structure holds the plate through drilling, tapping and milling alike — but the clamp still has to suit the job. A plate clamped only at two points can lift when the cutter pushes through, and a plate clamped over a hollow spot can flex under the drill. Spread the clamps near the areas being machined and check the plate sits flat before the program runs.
Then set one datum from a real feature of the part — a machined edge or a corner — and let every operation refer to it. That is the advantage one clamping buys: the drilled holes, the tapped threads and the milled edges are all positioned from the same point, so they line up with each other. If the datum is picked up from a rough sawn edge that is not square to the hole pattern, the error follows every operation. Set the datum, check it, and do not move the plate, the clamps or the datum until the part is finished.
One figure to check at this stage: Z-axis travel is 200 mm across the series. The part plus its fixture has to fit under that. Check it against the tallest feature before the run, not when the tool meets it.
3. The run: drill first, tap second, mill last
With the plate clamped and datumed, the job runs as one program in a fixed order. The order is part of the method, not a preference.
Drilling comes first. Every hole in the pattern is drilled before any tapping starts, so the taps cut into clean, finished holes and not into half-drilled material. Counterboring runs with the drilling step: the counterbore and the hole it belongs to are cut in the same clamping, from the same datum, so the counterbore sits concentrically over its hole.
Tapping comes second. The threads are cut while the plate is still in its one setup, so a threaded hole keeps its position relative to the drilled holes around it. If tapping were a separate job on a separate machine, the plate would have to be re-clamped and re-datumed, and the threads would land wherever the second setup put them.
Milling comes last. Pockets, edges and faces are cut after the threads are in, so milling chips do not sit in finished threads, and the milled surfaces are cut to the same datum as the holes they have to match.
| | What to check before moving on |
|---|
| Plate clamped once, flat, clamps near the work areas | Plate sits flat with no rocking; clamps will not be in the tool path |
| One datum picked from a machined edge or corner | Datum checked and recorded; part plus fixture fits 200 mm Z travel |
| All holes drilled, counterbores cut with their holes | Every hole in the pattern drilled before tapping starts |
| Threads cut in the drilled holes | No hole left untapped — the fool-proofing check in section 5 covers this |
| Pockets, edges and faces milled last | Milled surfaces match the hole pattern from the same datum |
| First part inspected before the plate is unclamped | Counterbore depth, thread completeness and milled dimensions confirmed while the datum still holds |
The last row is the one that saves rework. Once the plate is unclamped, its datum is gone; any correction means a new setup. Check the first part while the plate is still clamped, and only then release it.
4. The tool change happens inside the cycle
Between drilling, tapping and milling, the machine changes its own tools. The standard magazine holds 16 stations, and the spindle is a BT30 running up to 8000 rpm, with ER25 collets and 4 kW of spindle power. The drills, taps and milling cutters for one pattern stay on board, so the change between operations happens inside the cycle instead of between jobs.
That changes how a job is planned. Before the run, list every tool the pattern needs — drills for each hole size, counterbore tools, taps for each thread, milling cutters for the pockets and edges — and confirm the list fits the 16 stations. A pattern that needs more tools than the magazine holds has to be split, and splitting it means deciding which operations share a clamping and which wait for a second setup. It is better to find that out at the planning desk than halfway through a plate.
The spindle speed and the traverse speed set the pace of the rest of the cycle. Idle speed is 40 000 mm/min on the LF1020B and 60 000 mm/min on the three larger models, so long moves between hole groups on a 2000 x 4000 mm plate do not dominate the cycle time. The cutting itself runs at the feeds and speeds the material and tool call for — the point of the magazine is that the time between operations is a tool change, not a walk to another machine.
| | What it does in the cycle |
|---|
| | Cuts every hole in the pattern before tapping starts |
| | Cuts the counterbore over its hole, in the same clamping |
| | Cuts the thread in the drilled hole, in the same setup |
| | Cuts pockets, edges and faces last, to the same datum |
5. Programming flow: from drawing to finished part
The L series supports online and offline programming, and a shop will usually use both. The program is prepared from the drawing — the hole pattern, the counterbore depths, the thread sizes, the milled features — either at the machine or away from it in the office. Preparing it offline means the machine is not standing idle while the program is written; editing it online at the control means a small change to a pattern can be made where the machine stands, without a trip back to the office.
However the program is written, one check runs from it before cutting: CNC fool-proofing. The control checks the pattern rather than relying on the operator to catch a missed hole or a missed tapping. That check is the difference between a plate that comes off the machine complete and one that is found short of a thread at assembly, when the part has already left the machine and lost its datum.
The flow, in practice:
- Send the drawing with the hole pattern, thread sizes, counterbore depths and milled features.
- Build the program offline or online: drill and counterbore first, tap second, mill last.
- List every tool the program calls for and confirm it fits the 16-station magazine.
- Load the program, clamp the plate, set the datum, and check the part plus fixture against 200 mm Z travel.
- Run the fool-proofing check on the pattern before the first cut.
- Run the program in order and inspect the first part before unclamping.
6. A one-clamping checklist
Work through this before the first cut on every job, and again after any program change:
- Confirm the plate fits the model: LF1020B at 1000 x 2000 mm, LF-1325B at 1300 x 2500 mm, LF1530B at 1500 x 3000 mm, LF2040B at 2000 x 4000 mm.
- Clamp the plate once, flat, with clamps near the work areas and clear of the tool path.
- Set one datum from a machined edge or corner and record it.
- Check the part plus fixture height against 200 mm Z travel.
- Confirm the tool list fits the 16-station magazine — drills, counterbore tools, taps and milling cutters.
- Run the fool-proofing check on the hole and tapping pattern.
- Run drill, tap, mill in that order; inspect the first part before unclamping.
7. What to send before a quote
Send the part material, thickness, largest plate size and the operations needed — counterbore, tapping, milling — and our team will confirm the model from LF1020B to LF2040B and the tooling configuration. Add the drawing with the hole pattern, thread sizes and counterbore depths, so the tool list and the magazine fit can be checked at the same time.
8. Common questions
- Does the plate really not move between drilling and milling? No. The plate is clamped once and all three operations run from that one clamping, positioned from one datum. That is what keeps a tapped hole lined up with the milled edge it has to match.
- Why mill last instead of first? Milling first would leave chips in the threads and cut the reference surfaces before the holes exist. Drilling first, tapping second and milling last keeps each operation working on a finished result from the one before it.
- What if my pattern needs more than 16 tools? List the tools before the run. If the list is longer than the 16-station magazine, the job has to be split — decide at the planning stage which operations share the clamping rather than finding out mid-plate.
- Which model do I need for my plate? Start from the largest plate you run: LF1020B covers 1000 x 2000 mm, LF-1325B 1300 x 2500 mm, LF1530B 1500 x 3000 mm and LF2040B 2000 x 4000 mm. Check the tallest feature and fixture against 200 mm Z travel as well.
- Can the program be prepared away from the machine? Yes. Online and offline programming are both supported, so the program can be written in the office while the machine runs another job, and edited at the control when a pattern changes.
- What does the fool-proofing check actually catch? Missed holes and missed tapping in the pattern — the control checks the program rather than leaving it to the operator to spot a hole that was never drilled or a thread that was never cut.
- What materials can the L series run? Aluminum plate, aluminum profile, steel plate and square tube — counterbore and tapping for sheet metal work, and drilling, tapping and milling for thicker plate work.
Contact